As principal contractor Creagh managed this highly successful project as Brockaghboy Wind Farm, including electrical works and wind turbine installation. Creagh were responsible for the design and build of roads and crane hardstands for three 2.0MW wind turbines, each with a tip height of 110m. Brockaghboy Wind Farm was one of Northern Ireland Electricity's major connection projects, bringing another 45MW of renewable energy onto the grid.