Totterdown Reach, Bristol

The complex is found at the derelict former Esso garage in Bath Road by Totterdown Bridge and will be spread over four blocks up to 15-storeys high. The project has limited site access due to proximity to the Bath Road and needed tower cranes for install of the precast flooring and sandwich panels. Rapidres® is ideally suited to multi-storey projects where the layout is replicated consistently across each floor. It is a high performance precast insulated sandwich panel built offsite for high quality factory internal finishes with a wide range of external finishes that can match that of virtually any other build type.

Totterdown Reach is a residential development forming 152 homes with complementary commercial uses on the ground floor. The scheme supplies a footpath and cycle route from the neighbouring Paintworks development along the river and will allow connectivity for residents from street level down to the river Avon.

Designed by Feilden Clegg Bradley, the development has a minimum of 30% affordable housing.

The project will deliver a mixture of one-, two- and three-bedroom apartments along with three commercial units and underground parking. Totterdown Reach will be amongst the tallest buildings in Bristol on completion and a major new landmark for the city.

View the brochure here

Project Overview

  • Client:
  • Mid Group

  • Location:
  • Bristol

  • Timescale:
  • 2-3 weeks installation by Creagh

Education project in mind?

Contact us today!

T: 028 7965 0500

The Creagh Concrete website uses cookies. By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them see our cookie policy.