Bath Road

150 affordable flats overlooking the River Avon

The complex is located at the derelict former Esso garage in Bath Road by Totterdown Bridge and is spread over four blocks up to 15-storeys high. The project has limited site access due to proximity to the Bath Road and required tower cranes for install of the precast flooring and sandwich panels. Rapidres® is ideally suited to multi-storey projects where the layout is replicated consistently across each floor. It is a high performance precast insulated sandwich panel built offsite for high quality factory internal finishes with a wide range of external finishes that can match that of virtually any other build type.

Totterdown Reach is a residential development comprising of 152 homes with complementary commercial uses on the ground floor. The scheme provides a footpath and cycle route from the neighbouring Paintworks development along the river, and will allow connectivity for local residents from street level down to the river Avon.

Designed by Feilden Clegg Bradley, the development contains a minimum of 30% affordable housing.

The project delivers a mixture of one, two and three bedroom apartments along with three commercial units and underground parking. Totterdown Reach is amongst the tallest buildings in Bristol on completion and a major new landmark for the city.

Rapidres® Brochure

Project Overview

  • Client:
  • Mid Group

  • Location:
  • Bristol

  • Construction Value:
  • £36m overall value

  • Timescale:
  • 12 months

Animation Video of Build Sequence

Need help with your project? Get in touch.

Structures Sales Director

Mark Gilliland

028 7965 0500 mark@creaghconcrete.com

Senior Sales Estimator

Bernard Graham

02879449950 bgraham@creaghconcrete.com

Sales Estimator

Murat Hesapcioglu

028 7944 4355 murath@creaghconcrete.com

The Creagh Concrete website uses cookies. By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them see our cookie policy.