University of Greenwich, student accommodation

McLaren choose our precast concrete

McLaren Group turned to Creagh when tasked with the build of a new student accommodation for University of Greenwich. The project comprises 3 multi-storey buildings housing 358 residents, all built with a precast concrete frame.

Precast concrete was the obvious choice on this project for McLaren. It is speed of construction that underlines the attractiveness of using precast concrete systems as a framing material. Units are manufactured offsite ensuring the desired quality is met and leads to reduction of trades required onsite.

We were responsible for the design, manufacture, delivery and installation of all members of the precast concrete frame including precast columns and beams, hollowcore flooring, walls, lift shafts and precast stairs and landings.

Project Overview

  • Client:
  • McLaren Construction

  • Location:
  • London

The Creagh Concrete website uses cookies. By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them see our cookie policy.